This is the fourth blog in the series on deer hunting and Lean, Ergonomics (Human Factors, Six Sigma and Systems Thinking (L.E.S.S.).
In my last blog I explained how a couple of Lean principles are used pre and post-hunt. Well, those same principles can be used once the hunter arrives in the woods. As a reminder, two of the primary principles Lean are to reduce waste and non-value added activities. The goal of hunting is to spend as much time as possible hunting, i.e. in the stand/blind, and minimize the time spent on preparation.
Final pre-hunt preparation